My FAQ,最新最全的IT技术教程
最新100篇 | 推荐100篇 | 专题100篇 | 排行榜 | 搜索 | 在线API文档
首 页 | 程序开发 | 操作系统 | 软件应用 | 图形图象 | 网络应用 | 精文荟萃 | 教育认证 | 硬件维护 | 未整理篇 | 站长教程
ASP JS PHP工程 ASP.NET 网站建设 UML J2EESUN .NET VC VB VFP 网络维护 数据库 DB2 SQL2000 Oracle Mysql
服务器 Win2000 Office C DreamWeaver FireWorks Flash PhotoShop 上网宝典 CorelDraw 协议大全 网络安全 微软认证
硬件维护  CPU  主板  硬盘  内存  显卡  显示器  键盘鼠标  声卡音箱  打印机  机箱电源  BIOS  网卡  C#  Java  Delphi  vs.net2005
  当前位置:> 网络应用 > 上网宝典
PMP认证考试试题精选(57)
作者:佚名 时间:2003-10-10 08:39 出处:互连网 责编:MyFAQ
              摘要:PMP认证考试试题精选(57)

  561. The appointment or selection of a project sponsor is often based upon:
  A. The strategic importance of the project
  B. Who the customer is
  C. Whether the organization is project or non-project-driven
  D. The profitability of the project
  E. All of the above
  ANS: E
  562. The strong matrix versus a weak matrix.
  A. team members are more likely to be assigned to the project office in a strong matrix
  B. strong matrix is more difficult to manage.
  C. the balance of power has shifted away from the PM.
  D. functional managers no longer has control over the technical processes.
  E. All of the above.
  ANS: A
  563. When all members must unanimously agree before a decision is reached
  A. all members become committed
  B. decisions are reached slowly
  C. integrity is developed
  D. future decision making ability is enhanced
  E. All of the above.
  ANS: E
  564. A team may not be fully functional until each member
  A. seeks consensus in decision making
  B. feels personal acceptance
  C. depends on the team leader for direction
  D. A and B.
  E. All of the above.
  ANS: D
  565. Quality management deals with all of the following except:
  A. conformance to requirements/specifications
  B. satisfying the needs of the customer
  C. making products more desirable and luxurious
  D. A and C.
  E. B and C
  ANS: C
  566. The difference between a project and a program is that:
  A. A program is made up of multiple projects
  B. A program requires at least three times longer to plan than a project
  C. A project is a one-shot deal while a program is on-going
  D. A and C
  E. B and C
  ANS: D
  567. The functional organization is effective with a mature product or single product line.
  A. true
  B. false
  C.
  D.
  E.
  ANS: A
  568. The most common non-behavioral reason for projects being completed behind schedule and over budget is:
  A. Selecting the wrong person as the project manager
  B. Selecting the wrong person as the sponsor
  C. Accepting a high-risk project
  D. Ill-defined requirements
  E. All of the above
  ANS: D
  569. You have summarized the project and note that 28,000 hours have been scheduled, 25,000 hours have been earned and 26,000 hours paid.
  The correct conclusion is:
  A. The project is operating at a favorable cost efficiency ratio.
  B. the project is spending more than planned
  C. the project is behind schedule
  D. the project is ahead of schedule
  E. B and C
  ANS: C
  570. Considering alternate suppliers is a form of _____.
  A. Value engineering.
  B. Risk Analysis
  C. Contract Management
  D. Project integration
  E. All of the above.
  ANS: A
  
  
关闭本页
 
首页 | 投资与合作 | 服务条款 | 隐私政策 | 收藏本站 | 设为首页 | 新用户注册 | 免责声明 | 使用帮助
Copyright ©2005-2008 myfaq.com.cn All rights reserved. www.myfaq.com.cn 版权所有