My FAQ,最新最全的IT技术教程
最新100篇 | 推荐100篇 | 专题100篇 | 排行榜 | 搜索 | 在线API文档
首 页 | 程序开发 | 操作系统 | 软件应用 | 图形图象 | 网络应用 | 精文荟萃 | 教育认证 | 硬件维护 | 未整理篇 | 站长教程
ASP JS PHP工程 ASP.NET 网站建设 UML J2EESUN .NET VC VB VFP 网络维护 数据库 DB2 SQL2000 Oracle Mysql
服务器 Win2000 Office C DreamWeaver FireWorks Flash PhotoShop 上网宝典 CorelDraw 协议大全 网络安全 微软认证
硬件维护  CPU  主板  硬盘  内存  显卡  显示器  键盘鼠标  声卡音箱  打印机  机箱电源  BIOS  网卡  C#  Java  Delphi  vs.net2005
  当前位置:> 网络应用 > 上网宝典
PMP认证考试试题精选(41)
作者:佚名 时间:2003-10-10 08:39 出处:互连网 责编:MyFAQ
              摘要:PMP认证考试试题精选(41)

  411. In communications management, to assimilate through the mind or senses (as in new ideas) is the process of
  A. Understanding
  B. Communicating
  C. Receiving
  D. Decoding
  E. Comprehending
  ANS: C
  
  412. In general, the best long-lasting approach to settling project conflict is the _____ approach .
  A. Problem solving
  B. Compromise
  C. Withdrawal
  D. Smoothing
  E. Forcing
  ANS: A
  
  413. In which of the following cost estimating techniques are statistics models used:
  A. nonparametric cost estimating
  B. parametric cost estimating
  C. life cycle cost estimating
  D. bottom-up estimating
  E. All of the above.
  ANS: B
  
  414. The _____ specification delineates specific end use capabilities which can be tested in the acceptance procedure.
  A. performance
  B. functional
  C. technical
  D. base line
  E. operational
  ANS: B
  
  415. The contractual statement of work (CSOW)
  A. Must be the same as the proposal statement of work
  B. Does not identify reporting requirements
  C. Can be at a different level of detail (i.e. WBS level) than the proposal statement of work
  D. Identifies the contractor's organizational structure for the project
  E. All of the above
  ANS: C
  
  416. The key ingredient to a successful quality management program are _____.
  A. management's quality philosophy, operational quality assurance and operational quality control.
  B. quality evaluation methods and functional quality integrators.
  C. technical quality administration, the technical quality specifications, and the quality process review.
  D. quality evaluation methods, quality progress reviews and the technical quality specifications.
  E. All of the above.
  ANS: A
  
  417. The key purpose of project control is to:
  A. Plan ahead for uncertainties.
  B. Generate status reports.
  C. Keep the project on track.
  D. Develop the project road map.
  E. All of the above.
  ANS: C
  
  418. CIP embodies which of the following principals?
  A. constancy of purpose
  B. customer focus and involvement
  C. total involvement
  D. teamwork
  E. All of the above.
  ANS: E
  
  419. Excessive flexibility in specifying requirements will _____ the likelihood of time overruns.
  A. Reduce.
  B. Eliminate.
  C. Double
  D. Increase
  E. Not affect
  ANS: D
  
  420. Listening involves more than hearing sounds. The good listener
  A. Repeats some of the things said
  B. Finishes the speaker's sentences
  C. Writes everything down
  D. Nods his head frequently
  E.
  ANS: A
  
  
关闭本页
 
首页 | 投资与合作 | 服务条款 | 隐私政策 | 收藏本站 | 设为首页 | 新用户注册 | 免责声明 | 使用帮助
Copyright ©2005-2008 myfaq.com.cn All rights reserved. www.myfaq.com.cn 版权所有